Skip to content

Quality file

Material incoming report: one PDF instead of weeks of file chasing

At project close, gathering every certificate, heat number and used position from folders and email can take weeks. İnsya ERP keeps that data from receiving onward and builds the report itself.

Girdi paneli: seçilen proje, malzeme ve iş emirlerinden sertifika ve pozisyonlar otomatik toplanır; ekleriyle tek PDF

How it works

The report is built from records already entered along the process — no separate document hunt at the end.

Certificate linked at receiving

EN 10204 3.1 / 3.2 certificates and dimensional checks are uploaded to the stock item; heat no sits on the item.

Job prep ties material to the project

When material is cut and issued with a work order, the project number and drawing position are recorded.

Pick on the panel — ERP collects

Choose project, material or work order; certificates, project and job-prep numbers and drawing positions fill in automatically.

Sign, publish, one PDF

QCI/QCE-signed reports are revisioned; “Print PDF (with attachments)” ships the report and every certificate as one file. Heat-no list exports to Excel.

All incoming reports in one list

Revision, project and job-prep numbers, document count, signing QCI/QCE and publish status.

Malzeme girdi raporları: revizyon, proje ve İH numaraları, doküman sayısı, QCI/QCE ve yayın durumu

Known by many names

The label changes by company; the need is the same: a documented trail from receipt to equipment.

Material incoming report
Shows the material trail from receipt to project.
Material traceability record
Which heat no was used in which position.
Receiving inspection report
The control record at goods receipt.
Quality / manufacturing file
Manufacturing data book, MDR or final dossier delivered to the customer.

About the incoming report

How do we load existing certificates?

Upload certificate PDFs to the related stock item; for new receipts this happens at receiving. For past projects, start with materials still in progress.

What if the report changes?

A revision is created from the published report; the previous revision stays on record; report number tracks with the revision number.

Can we download every incoming report for one project?

Yes — select reports from the list and download as PDF; each report includes its own certificates.

DEMO REQUEST

Let’s build your quality file together

On the demo we’ll show how the incoming report forms from materials on one of your own projects.