Skip to content

New

What’s new in İnsya ERP?

New modules for everyday work on the shop floor, in the technical office and in purchasing. Screens and documents carry Turkish and English terms side by side.

Subcontracted work

Subcontracting

  • ISO 9001 8.4
  • EN 1090 / ISO 3834
  • ASME

Work you send out or take in is tracked under your own project number: a simple three-step flow or a detailed, quality-planned one.

  • Both directions on one screen: work we subcontract out and toll work we take in from customers, each with its own labels.
  • Simple tracking for non-code work; for ASME / PED work, cutting, fit-up, welding, NDT, heat treatment, pressure test and final inspection steps (ITP).
  • Hold and witness points: the next step cannot be recorded until quality signs off; a drawing revision waits for the subcontractor’s acknowledgement.
  • Status is derived from the steps, never picked by hand; the job cannot close until required documents (WPS, WPQ, MTR, NDE report, Form U-2) are in.
  • Bilingual (Turkish / English) A4 subcontract order; prices stay off the technical screens.
Related module: Project Tracking

Bill of materials from drawings

Drawing-to-BOM with AI

  • DXF
  • DWG
  • PDF
  • BOM

The parts list and title block are read with AI; rows are checked by the technical office before they become material requests.

  • DXF, DWG, PDF, PNG and JPG; text inside blocks is read and the BOM table is rebuilt from text positions.
  • Drawing no, revision, material, grade, quantity and dimensions; material type, grade and standard are matched to your own master data.
  • Uncertain cells are flagged yellow with the reason in a tooltip; before requests are created you are told how many flagged cells are unchecked.
  • For DXF / DWG only the text is sent to the AI service, never the drawing itself.
  • Reading can be stopped and resumed; the AI provider (OpenRouter, Gemini, OpenAI) is chosen in settings.
Related module: Purchasing

Material planning

Material Planning

  • Lead time

Every material request of the selected projects in one list: whether each item comes from stock or from a PO, and where it stands today.

  • Each row shows the supply source (from stock / from PO) and a stage bar: request, purchasing, receiving, stock-in, job prep.
  • Items marked as covered from stock show as a warning in purchasing, so the same material is not ordered twice.
  • Actual lead time by material type is offered back to planning as a suggestion.
Related module: Production Tracking

Purchase order letter

Purchase Order

  • Incoterms 2020
  • EN 10204

The formal order to the supplier, built from approved quotes, with an approval flow, revision archive and supplier confirmation.

  • Pick a supplier and its POs from approved quotes come in; price, quantity and due date are filled from the PO.
  • Draft → approval → sent → supplier confirmation (ref no, confirmed delivery) → closed; whoever prepared it cannot approve it (four-eyes).
  • Opening a revision archives the previous version; older revisions can still be printed.
  • Bilingual A4 document with Incoterms 2020 delivery terms and EN 10204 certificate type.
  • Supplier quotes priced per kg, metre, m² or piece; plate and pipe weights come from one shared measure service.
Related module: Purchasing

Nonconformance and CAPA

NCR & CAPA

  • ISO 9001 8.7 / 10.2
  • EN 1090 / ISO 3834
  • 8D
  • ASME

Nonconformances are opened in 8D form and followed through root cause and corrective action; closing conditions are listed on screen.

  • Record no, source, severity (minor / major / critical), batch / heat no, drawing no and revision.
  • D1–D8: description, containment, root cause (5 Whys, fishbone), disposition (use-as-is, repair, rework, reject, return, scrap) and verification.
  • ASME-scope records cannot close without Authorized Inspector acceptance; repairs require a new NDE result.
  • Corrective and preventive actions with owner and due date; every change kept in a non-deletable audit trail.
  • Bilingual, signed NCR report with photo, NDE report and material certificate (MTR) attachments.

Process times and Gantt

Lead time & on-time delivery

  • Lead time
  • OTD

How long each step from request to production really takes, and how well suppliers keep their dates, measured from the dates in your records.

  • Median and 80th-percentile time between request → PO → receiving → stock → production; where the time goes in one bar.
  • On-time delivery rate and average delay per supplier.
  • Waiting work: which step each item not yet released to production is in, and for how many days.
  • Process Gantt: work orders of the selected projects step by step on a timeline.
Related module: Purchasing

Manufacturing finance

Manufacturing cost & invoicing

  • Optional
  • UBL-TR
  • Three-way match

İnsya is not an accounting package: it processes production cost and invoice data and hands the official entries to your accounting software. Optional module.

  • The supplier’s e-invoice XML (UBL-TR) is uploaded at receiving and matched against the PO and goods receipt (three-way match).
  • Exchange rates come from the Central Bank of Turkey bulletin; the TRY value is fixed at the invoice-date rate.
  • Project cost: material, labour and direct expenses; actual, committed and budget on one bar.
  • Sales billing plan: advance, milestone and progress billing; whoever marks a line as earned cannot approve it.
  • Overheads and an export package for your accounting software (purchase, sales and expense vouchers; account mapping).
  • Amounts are visible only to authorised users; technical screens show no prices.

A calmer, faster interface

UI refresh

A new icon set, lists that fill row by row, and permissions split per module.

  • Consistent, clean line icons with readable colours in dark mode too.
  • Lists load with a row-by-row skeleton, so the screen never sits blank.
  • New modules split view, add, edit, approve and delete rights; nobody approves their own work.
Related module: Desktop UI
DEMO REQUEST

Let’s walk through the screens

In a 30-minute screen share we walk quote, project and stock screens on one of your own projects. No install needed.